Siemens SGT-300 gas generator







If you decide to buy equipment at a low price, make sure that you communicate with the real seller. Find out as much information about the owner of the equipment as possible. One way of cheating is to represent yourself as a real company. In case of suspicion, inform us about this for additional control, through the feedback form.
Before you decide to make a purchase, carefully review several sales offers to understand the average cost of your chosen equipment. If the price of the offer you like is much lower than similar offers, think about it. A significant price difference may indicate hidden defects or an attempt by the seller to commit fraudulent acts.
Do not buy products which price is too different from the average price for similar equipment.
Do not give consent to dubious pledges and prepaid goods. In case of doubt, do not be afraid to clarify details, ask for additional photographs and documents for equipment, check the authenticity of documents, ask questions.
The most common type of fraud. Unfair sellers may request a certain amount of advance payment to “book” your right to purchase equipment. Thus, fraudsters can collect a large amount and disappear, no longer get in touch.
- Transfer of prepayment to the card
- Do not make an advance payment without paperwork confirming the process of transferring money, if during the communication the seller is in doubt.
- Transfer to the “Trustee” account
- Such a request should be alarming, most likely you are communicating with a fraudster.
- Transfer to a company account with a similar name
- Be careful, fraudsters may disguise themselves as well-known companies, making minor changes to the name. Do not transfer funds if the company name is in doubt.
- Substitution of own details in the invoice of a real company
- Before making a transfer, make sure that the specified details are correct, and whether they relate to the specified company.
Seller's contacts




















SIEMENS Gas Turbine Skid SGT-300 8MW
Base Module
Steel construction Skid
Gas Turbine Core Engine: Including 10-stage compressor
2-stage turbine
6 DLE burners
annular combustion chamber with ignition bolt and flame monitoring
adjustable inlet guide vane
tilting pad thrust bearing
body fuel line
cooling and sealing air system
cylinder
chassis
body paint insulation
etc
Gear Box: Including main reduction gear
auxiliary gear
coupling
monitoring instrument
etc
Lube Oil System: Including main lubricating oil pump
auxiliary lubricating oil pump
accident lubricating oil pump
oil mist separation
lubricating oil filter
cooler
temperature
liquid level
pressure monitoring instrument
oil tank
pipeline
etc
Start System: Including starting motor and hydraulic motor
etc
Gas Fuel System: Including flow control valve
filter
quick cut-off valve
release valve
monitoring instrument
etc
Generator TFW8-4 (XEMC CHINA),8MW: Including generator body
air water cooler
brushless excitation
temperature and vibration monitoring instrument
Air Intake System: Including rain cover
water mist separator
two-stage static filtration (G4+F9)
inlet
silencer
expansion joint
platform aisle
monitoring instrument
etc
Enclosure and Ventilation System: Including open-air noise reduction cover
with lighting
ventilation fan
maintenance platform
baffle valve
etc
Exhaust System: Including body
insulation
expansion joint (with insulation)
monitoring instrument
etc
Fire Fighting System: Temperature sensing probe
flame probe
infrared combustible gas detector
CO2 cylinder
local cylinder room
connection pipe
etc
Compressor Washing Unit : Including water tank
diaphragm pump
low pressure water pipe
pressure gauge
etc
GT Control System: Including PCS7 control system
HMI operator station
disk-mounted emergency jump-off button
distributed I/O disk
etc
Special Tools: Including some installation
commissioning
maintenance tools
spare parts
Drawings: Including factory certificate
drawings and operation and maintenance manual<br>Express Financing Get Pre-Approved<br>Get a FR8Star Shipping Estimate